Bandar Imam Khomeini 64 Beds Hospital

Previous slide
Next slide

Employer: Navid Zar Chimi

Consultant Engineers: Iran Arch Consulting Engineers

Contract Price: 999,208,642,789 Rials With a 25% Increase

Contract Year: 2019

Location: Bandar-e-Imam Khomeini, Khuzestan Province

Infrastructure: 10,800 Square Meters

Type of activity: Construction & Installation

 

The project includes excavation & embankment, constructing the concrete structure, masonry and finishing works with installing all mechanical and electrical equipment. The main building with an infrastructure of about 9,891 square meters is in 3 blocks of 1 to 5 floors has a helipad; and the ancillary buildings have an infrastructure of ​​about 900 square meters in addition to fencing and landscaping in an area of ​​21,200 square meters. The mechanical installation system of the building consists of an integrated air-cooled chiller, hot water boiler, ventilator and fan coil, and the most important specifications of the project include the following:

 

– Excavation and Embankment: 32,200 Cubic Meters

– Formatting: 29,500 Square Meters

– Reinforcement: 900 Tons

– Concrete: 11,500 Cubic Meters

– Knauf Wall and Ceiling: 25,000 Square Meters

– Stonework: 8,350 Square Meters

– Tiling: 2,300 Square Meters

– Electrical and Mechanical Plumbing: 90 Kilometers

– Wiring and Cabling: 132 Kilometers