The project encompasses civil and structural works, as well as electrical and mechanical installations, for a two-story refinery central control building with a floor area of 780 square meters, including site landscaping. The building’s mechanical system consists of split air conditioning units and three rooftop package units. Key project specifications include:
Formwork: 5,043 m²
Concrete pouring: 1,232.56 m³
Heavy steelwork: 258 tons
Waterproofing: 1,875 m²
Tiling: 2,342 m²
Mosaic flooring: 1,937 m²
Stone masonry: 1,700 m²
Electrical and mechanical piping: 2,421 linear meters
Wiring and cabling: 9,300 linear meters
Ductwork: 1,166 m²