Project Specifications

Client: Lavan Oil Refining Company

Consultant: Project Executor for the Lavan Oil Refining Company’s Fuel Oil Upgrading and Reduction Project

Contract Value (including contract increase): 2,002,595,060,065 Rials (based on the 1402 [2023/24] Schedule of Rates)

Contract Duration: 14 months

Project Location: Lavan Island

Type of Activity: Civil Works and Facilities

About the Project

The project encompasses civil and structural works, as well as all mechanical and electrical installations for a laboratory building and two warehouse units—comprising three shed-style structures with a total floor area of ​​3,142 square meters—along with 1,500 square meters of site landscaping and parking facilities. The building’s mechanical system utilizes chillers and wall-mounted fans. Key project specifications include the following:

Excavation and earthworks: 4,350 cubic meters

Concrete pouring: 2,150 cubic meters

Heavy steelwork: 235 tons

Light steelwork: 214 tons

Brickwork (double-sided facing): 1,690 square meters

Concrete block masonry: 4,125 square meters

Waterproofing: 5,284 square meters

Thermal insulation: 4,988 square meters

Wiring and cabling: 18 kilometers