The project encompasses earthworks, the concrete structural frame, structural and finishing works, and all mechanical and electrical installations for a main building complex with a total floor area of approximately 12,000 square meters. This complex includes a four-story elderly care facility, a two-story specialized polyclinic, and a two-story industrial kitchen, along with site landscaping. The building’s mechanical system comprises an integrated air-cooled chiller, four cast-iron hot water boilers (with capacities of 426,000 and 826,000 kcal/h), ducted fan coil units (400 and 1,400 CFM capacities), and air handling units of varying capacities. Key project specifications include the following:
Excavation and earthfilling: 37,550 cubic meters
Concrete pouring: 9,400 cubic meters
Reinforcement (rebar) work: 885 tons
Light steelwork: 430 tons
Waterproofing: 9,440 square meters
Thermal insulation: 16,900 square meters
Tiles and ceramics: 14,200 square meters
Stone masonry: 11,200 square meters
Wiring and cabling: 126 kilometers
Electrical and mechanical piping: 92 kilometers
LED lights: 3,450 units