Masjed Soleyman ۱۶۰-Bed Hospital

Project Specifications

Client: Ministry of Housing and Urban Development – ​​Organization for the Execution of Government and Public Buildings and Facilities
Consultant: Iran Ark Consulting Engineers
Contract Value: 357,000,000,000 Rials (including the 25% variation and supplementary agreement; based on the 1385 [2006/07] price schedule)
Contract Year: 1385 (2006/07)
Contract Duration: 39 months
Project Location: Masjed Soleyman
Activity Type: Buildings and Facilities

About the Project

The project encompasses earthworks, concrete structural framing, structural masonry and finishing works, and all mechanical and electrical installations for a main building complex—comprising six blocks ranging from two to five stories with a total floor area of ​​approximately 14,500 square meters—as well as ancillary buildings totaling around 800 square meters, alongside perimeter fencing and landscaping across an area exceeding 35,000 square meters. The building’s mechanical system features an integrated air-cooled chiller, hot water boilers, air handling units, and fan coil units; key project specifications include the following:
– Electrical and mechanical piping: 110 km
– Ductwork: 10,000 m²
– Wiring and cabling: 150 km
– Excavation and earthfilling: 145,000 m³
– Formwork: 50,000 m²
– Rebar work: 1,350 tons
– Concrete: 13,000 tons
– Knauf (drywall) walls and ceilings: 32,000 m²
– Stonework: 27,000 m²
– Tiling: 14,500 m²