Miduk Copper Complex Phase ۲ Concentration Plant Project

Project Specifications

Client: Kani Mes Industries and Mines Technical and Engineering Services Company

Consultant: Sazeh Pardazi Consulting Engineers

Contract Value: 3,734,054,975,794 Rials (based on the 1404 price schedule)

Contract Duration: 10 months

Project Location: Shahr-e Babak

Type of Activity: Structures and Facilities

About the Project

This project comprises a seven-story main administrative building, a main concentrator plant hall (21.3 meters in height), and several auxiliary structures—including subsidiary administrative offices, a main workshop, a diesel generator room, a sports facility, a general-purpose building, a main laboratory, a mechanical plant, and silos—with a total built-up area of 17,894 square meters, located at the Miduk Copper Complex in Shahr-e Babak, Kerman Province. A key feature of the project is the GFRP polymer dry-installation facade, covering an area of approximately 6,000 square meters; other notable specifications include:

Concrete pouring: 2,556 m³ | Acrylic paint: 10,494 m²

Concrete surface hardener application: 6,185 m² | Channeling/Ducting: 4,325 m²

Standard brick masonry: 1,909 m³ | Electrical and mechanical piping: 20,015 linear meters

Double-sided brick facade: 9,475 m² | Wiring and cabling: 12,130 linear meters

Autoclaved block masonry: 18,652 m² | Light fixtures: 5,074 units

Waterproofing: 9,004 m²

Light steel works: 270 tons

Roof and wall sandwich panels: 7,371 m²

Cement plastering: 21,397 m²

Tiling: 6,500 m²

Mosaic flooring: 4,691 m²

Epoxy flooring: 14,857 m²