This project comprises a seven-story main administrative building, a main concentrator plant hall (21.3 meters in height), and several auxiliary structures—including subsidiary administrative offices, a main workshop, a diesel generator room, a sports facility, a general-purpose building, a main laboratory, a mechanical plant, and silos—with a total built-up area of 17,894 square meters, located at the Miduk Copper Complex in Shahr-e Babak, Kerman Province. A key feature of the project is the GFRP polymer dry-installation facade, covering an area of approximately 6,000 square meters; other notable specifications include:
Concrete pouring: 2,556 m³ | Acrylic paint: 10,494 m²
Concrete surface hardener application: 6,185 m² | Channeling/Ducting: 4,325 m²
Standard brick masonry: 1,909 m³ | Electrical and mechanical piping: 20,015 linear meters
Double-sided brick facade: 9,475 m² | Wiring and cabling: 12,130 linear meters
Autoclaved block masonry: 18,652 m² | Light fixtures: 5,074 units
Waterproofing: 9,004 m²
Light steel works: 270 tons
Roof and wall sandwich panels: 7,371 m²
Cement plastering: 21,397 m²
Tiling: 6,500 m²
Mosaic flooring: 4,691 m²
Epoxy flooring: 14,857 m²