Project Specifications

Client: Golgohar Mining and Industrial Company
Consultant: Civil Management Department, Golgohar Mining and Industrial Company
Contract Value: 2,725,000,000,000 Rials
Contract Duration: 18 months
Project Location: Sirjan
Activity Type: Structures and Facilities

About the Project

The project has a total floor area of ​​11,800 square meters and consists of two seven-story blocks connected by a bridge at the top level. The building’s floor plan combines circular and rectangular shapes; the circular section spans seven stories, while the rectangular section comprises two stories in Block A and three stories in Block B. The façade features a curtain wall system overlaid with an aluminum louver grid. The building is equipped with eight elevators—three in Block A and five in Block B. Heating and cooling are provided via hot water boilers, chillers, and air handling units. Additionally, the project includes fire detection and suppression systems, CCTV surveillance, and an audio system.

Brickwork: 2,550 m²

Leca block masonry: 5,450 m²

Waterproofing: 6,270 m²

Thermal insulation: 9,800 m²

Light steel works: 191 tons

Aluminum louvers: 30,000 linear meters

Curtain wall and composite facade: 8,200 m²

Knauf suspended ceilings: 26,400 m²

Tiles and ceramics: 9,500 m²

Mosaic and washed concrete paving: 4,000 m²

Stone works: 23,825 m²

LED lights: 3,120 units

Wiring and cabling: 63 km

Electrical and mechanical piping: 13 km

CCTV cameras: 135 units