Employer: School Renovation Administration of Khuzestan Province

Consultant engineers: Paya Namad Memari Zista Consultant Engineers

Amount of contract: 591,440,000,817 Rials

Location: Ahvaz, Khuzestan province

Type of activity: Building and Installation

Infrastructure area: 6302 square meters

Duration of contract: 31 months

Base price list: years 1398 & 1399

 

The project includes excavation and embankment, building construction, mechanical and electrical installation of the main building and landscaping around it with an infrastructure of about 6302 square meters in 6 blocks of 1 to 3 floors with a sports hall shed and a separate amphitheater building. The mechanical installation system of the building consists of solar panels, VRF systems, air conditioning and condensing equipment. The following are the most important features of the project:

-Excavation ‎and ‎Embankment: 2,700 ‎Cubic ‎Meters

-Framework: 14,000 Square Meters

-Waffle Roof Framework: 550 Square Meters

-Reinforcement: 141 Tons

-Concrete: 5,600 Cubic Meters

-Knauf False Ceiling: 4,700 Square Meters

-Tile Work: 1,400 Square Meters

-Stone Work: 5,100 Square Meters

-Electrical and Mechanical Piping: 184,000 Meters Long

-Wiring and Cable: 124,000 Meters Long

-Drainage: 3,000 Square Meters

-Solar Panel: 18,000 Watts (47 Panels)