The Management and Planning Organization Building of Khuzestan

The project includes excavation and embankment, foundation, construction and ‎installation of steel frame, masonry and finishing works and installing all mechanical ‎and electrical equipment of the main building with an area of approximately 17,800 ‎square meters in seven floors and landscaping for above 6500 square meters.‎

more 1

Ministry of Science, Research and Technology

This building has an area of approximately 54,000 square meters on 23 floors.‎

more 2

Pipeline Repair Yard ‎of Khorramabad

The Pipeline Repair Yard of Khorramabad is located on a land with an area of 30,000 ‎square meters in Khorramabad city. The project includes an office building, guest house ‎and canteen, security building, electricity substation, warehouse, parking lot, ‎transportation workshop and pipeline workshop, heavy machinery parking lot, open ‎warehouse and helipad.‎

more 3

Quds Girls’ Educational Complex

The project includes excavation and embankment, construction and mechanical and ‎electrical installation of the main building and landscaping around it with an ‎infrastructure of about 6302 square meters in 6 blocks of 1 to 3 floors with a sports hall ‎shed and a separate amphitheater building. The mechanical installation system of the ‎building consists of solar panels, VRF systems, air conditioning and condensing ‎equipment.‎

more 4

Iranian Space Research Center

The contract of the mentioned project is for the implementation of its steel structure, ‎masonry and finishing works, and installations with an infrastructure of approximately ‎‎12,000 square meters on 10 floors.‎

more 5

Masjed Soleyman 160 Bed Hospital

The project includes of excavation and embankment, construction of concrete frame, ‎masonry and finishing works and installing all mechanical and electrical equipment. The ‎main building is approximately 14,500 square meters in six blocks of two to five floors ‎and peripheral buildings with an area of approximately 800 square meters plus fencing ‎and landscaping in 35,000 square meters area.‎

more 6

Bandar Imam Khomeini 64 Beds Hospital

The project includes excavation & embankment, constructing the concrete structure, masonry and finishing works with installing all mechanical and electrical equipment. The main building with an infrastructure of about 9,891 square meters is in 3 blocks of 1 to 5 floors has a helipad; and the ancillary buildings have an infrastructure of ​​about 900 square meters in addition to fencing and landscaping in an area of ​​21,200 square meters.

more 7

Yazd Operation Center

The project includes excavation and embankment, building construction and mechanical and electrical installations of the Yazd gas pipeline operation center site with an infrastructure of about 2,870 square meters, including administrative buildings and industrial sheds, a power generator, overhead crane, radiant heater and other equipment, along with landscaping with an infrastructure of 14,151 square meters.

more 8